Operations

The Eagle River Division layout operates under CTC control, worked by a dispatcher.  To run the railroad, 6 to 8 operators are needed.  Jobs are designed to accommodate a range of skills, proficiency levels, and interests.  A detailed description of each job can be found on the Documentation page.

Comments are closed.