New Year, New Layout

A brief update on what’s going on with the layout since the upper deck was removed in late 2024.

  • Primary staging area completely redone with five 12-foot long stub-ended staging tracks.
  • Wye installed for turning locomotives.
  • Brewery and lumber yard relocated next to staging area.
  • Lenz DCC replaced with TCS CS-105 Command Station & booster.
  • Checkerboard Square area (Purina) track now connects directly with staging.
  • JMRI-based CTC panel completely redone.
  • Operational focus changed to Missouri Pacific St. Louis Terminal.
  • Location names changed to Mopac switching zones.
  • Some industry names changed to reflect Mopac-served customers.
  • Relocation of dispatcher’s desk to closet area.
  • Both A-D tracks for Ewing Ave. Yard extended an additional 360 scale feet.
  • Remote control of Ewing Ave. Yard A-D track turnout installed.

Comments are closed.