Skip to content
New Year, New Layout
A brief update on what’s going on with the layout since the upper deck was removed in late 2024.
- Primary staging area completely redone with five 12-foot long stub-ended staging tracks.
- Wye installed for turning locomotives.
- Brewery and lumber yard relocated next to staging area.
- Lenz DCC replaced with TCS CS-105 Command Station & booster.
- Checkerboard Square area (Purina) track now connects directly with staging.
- JMRI-based CTC panel completely redone.
- Operational focus changed to Missouri Pacific St. Louis Terminal.
- Location names changed to Mopac switching zones.
- Some industry names changed to reflect Mopac-served customers.
- Relocation of dispatcher’s desk to closet area.
- Both A-D tracks for Ewing Ave. Yard extended an additional 360 scale feet.
- Remote control of Ewing Ave. Yard A-D track turnout installed.
Cookie Consent with Real Cookie Banner